Landmark Consulting is the prime Architect for the restoration of the Napoleon Transit Station. The RTA uses this site to store materials and includes a shed to perform maintenance on its vehicles. Our team includes a firm specializing in historic architecture, a DBE engineering firm and a DBE environmental firm. This project is FEMA funded and Federal Transit Administration (FTA) grant funded. We conducted a walk through the facility with FEMA and the RTA explaining the comparison of the PW to storm damages that were not included. We prepared an existing condition report detailing the reasons for the adjustment being careful not to include ineligible work. We are currently assisting with the development of an improved project request and are supporting the RTA in its grant request to the FTA.
Landmark Consulting is the disaster recovery consultant for the Chennault International Airport Authority, where we manage the project reimbursement, closeout, and insurance reconciliation processes. Landmark is currently working on 16 priority project worksheets to reconcile scope and insurance adjustments to ensure a smooth closeout process of each project. Our Compliance Assurance Program has implemented a documenta- tion system that codes all expenses to a project worksheet, so that all eligible expenses are reviewed and submitted for reimbursement. This process also captures all out of scope expenses and triggers a version request. Landmark’s thorough review of the insurance reconciliation resulted in the negotiation of $165,000 with FEMA and the State of Louisiana. Landmark estimates an additional $600,000 by way of final reconciliation to align actual cost and scope. All Direct Administrative Costs have been captured in a project version request to reimburse Chennault for Landmark’s services to date.
Landmark’s Compliance Assurance Program team was requested by the New Orleans Aviation Board (NOAB) through TMG Consulting to review and closeout several Federal Aviation Administration (FAA) funded projects. Although the Project Management was complete and the construction contracts were closed, Landmark was tasked to review and map several federal funding sources. Landmark created a management plan, finalized the requirements per the FAA and coordinated our efforts with the construction manager, Aviation Resources Team, the NOAB finance department, and prepared reporting on our progress. The Compliance Assurance Team designed a checklist based on the FAA requirements and facilitated document collection to prepare an electronic binder including all files needed for grant closure. We contributed information for weekly coordination meetings, established a reporting system/schedule, and set up a team SharePoint site to share and maintain documentation.
Landmark was contracted to assist the Storm Mitigation and Resilience Office (SMRO) with the documentation of its current functions, the development of strategies for the long-term assimilation of these functions within the Agency, and assist with the implementation of programmatic initiatives that will ensure the Agency’s readiness in all phases of future disaster. The Port of New York/New Jersey’s current change order process did not allow the scope of work tied to storm damages to be captured by the SMRO compliance team for version requests and reimbursement to various sources. We amended the current change order process to insure compliance with disaster damages eligible for Sandy and non-Sandy funding. Utilizing assessments, data collection and report recommendations Landmark’s team created the least intrusive intervention that would improve communication among SMRO, Finance, Engineering and Project Managers, to insure compliance with disaster related damages according to funding sources and scope requirements.
Landmark joined the City of Columbia within 3 days of their disaster, bringing a team of professionals experienced in Municipal Administration, Governmental Relations, Engineering, Architecture, Public Assistance, Hazard Mitiga- tion and Community Development Block Grants. Landmark’s Program Management team worked closely with FEMA, HUD, State, and local emergency management officials to develop efficacious disaster response and recov- ery programs. Project scope included repairs and equipment replacement for water and wastewater infrastructure, parks and recreational facilities, police and fire departments, and repairs, replacement, and acquisition of disaster damaged housing. Our Program Management team kept the goal of reimbursement a priority at all times as we assisted with design, construction phases, cash flow analysis, and tracking of direct administrative costs. Landmark’s Compliance Assurance Program team ensured our client goals and objectives were met by closely adhering to federal requirements under the Stafford Act. Installing proper guidelines and procedures for procurement, cost alignment, complete scopes of work, full reimbursement documentation (submittal and retention), and guiding project closeout were paramount to the work of the program. Our team performed assessments of storm-damaged facilities which resulted in an estimated project funding amount of $90 million. With the help of Landmark professionals, project worksheets for the City of Columbia projects have been formulated to capture the damages and estimates to obligate Public Assistance, 406 Mitigation, and 404 Hazard Mitigation Grant Program funding. An expedited emergency PW that was formulated, obligated, and advanced in the amount of $7.6 million was recognized by state officials as being one of the largest and most organized projects submitted for funding. A direct allocation request was also submitted to HUD, which resulted in successfully securing an award for the City of Columbia for $26.1 million in CDBG-DR funding.
Consulting manages the Disaster Recovery for the Borough of Seaside Heights and manage s the project worksheet production, reimbursement and closeout claims. Due to Landmark’s processes and systems used to align scope and maintain accurate supporting documentation throughout the project life cycle, the Borough met it’s project deadlines, and received the reimbursements needed to keep the famed boardwalk operational. Our Compliance Assurance Program’s document management system codes each invoice to a specific project worksheet so that all eligible expenses were included in reimbursement requests. Landmark successfully obtained $3 million hazard mitigation funds, resulting in a stronger structure that can prevent coastal erosion. Over $27 million has been obligated in project worksheets, which is more than double the Borough’s original estimate for their recovery. This estimate includes eight (8) replacement facilities. The Borough’s reimbursement amount to date is approximately $11 million. Currently, Landmark is coordinating the final reconciliation and grant closeout for 3 project worksheets valued at $2.6M, with no related findings or issues. All Direct Administrative Costs have been captured in a project version request to reimburse Seaside Heights for Landmark’s services. As a pro bono project, Landmark reached out to KaBoom! and delivered 2 new playgrounds to the Borough volunteering the services of a project manager and an architect.
The Orleans Parish School Board managed an unprecedented recovery program to include the project management and direct management of numerous facilities located across the Greater New Orleans area. The program included building new, state of art facilities and the renovation of multiple historic properties. We provided project management services as a sub-consultant to Jacobs/CSRS. Additionally, we managed 11 clean and secure projects. These are facilities that are being “moth balled” or stored for future development. The entire program is FEMA funded.
Landmark Consulting LLC’s Project Management and Compliance Assurance Teams co-managed $1.5M in project costs for the removal of environmental hazards, demolition of three campus facilities and the closeout of FLS project worksheets associated with the. site. Landmark prepared the procurement documents, advertised, negotiated all contracts and bid the abatement and demolition of the three buildings. Landmark represented FLS at the Neighborhood Conservation Committee Meeting, the Code Enforcement Hearing, and presented a scheule to remove the blight, thereby avoiding substantial fines. Our project manager and construction supersor was onsite working closely with the Louisiana Department of Environmental Quality and the Contractor to ensure compliance with State and Federal guidelines which resulted in FEMA issuing a letter committing to Alternate Project approval. After assessing an unfavorable prior audit from the Office of Inspector General, Landmark consulted with First Line Schools (FLS) to address the findings and to prepare the necessary steps needed to protect current and future funding. Landmark provided advice to FLS’s Board, met with Recovery School District, reviewed and advised on terminology needed to satisfy FEMA’s requirements resulting in a new lease agreement and new Cooperative Endeavor Agreement with the Recovery School District (RSD) which saved FLS over $1M in future insurance costs. Additional work includes preparing an improved project, reviewing contents PW to secure funding for contents reimbursements, and securing DAC funding for grants management costs which resulted in no out-of-pocket expense to FLS.
Landmark provided Xavier University FEMA Public Assistance grants management and closeout services for 787 Project Worksheets valued at $83,354,840.33 in storm related damages. Landmark’s Program Management team was responsible for design, construction and demolition projects on campus. Landmark’s Compliance Assurance Program team ensured that proper guidelines and procedures for procurement, cost alignment, scope of work, reimbursement, documentation submittal and retention, and project closeout were met, both timely and efficiently while strictly adhering to Federal Requirements under the Stafford Act resulting from Hurricane Katrina and Hurricane Rita. Our closeout scope included individual federal grant project review, supporting documentation assembly, final inspection preparation, obligated funding protection, eligibility advocacy, and insurance reconciliation assistance for all of their FEMA Project Worksheets (PWs).
Dillard University finalized the construction of a new Student Union. Landmark was awarded the contract to close-out the construction of the building and to manage the completion of the site work. This phase of the project is valued at $2.7 Million. We managed the completion of the punch list and the commissioning and final payment to contractor on this LEED Gold facility. We also managed the construction of the drainage, paving and landscaping to complete the exterior of the facility. Our experience with local private universities and planning for student safety in an occupied building was instrumental in the success of this project.
Xavier University was awarded a grant by FEMA to prepare a campus wide Hazard Mitigation Plan. Landmark created a multi department working committee including Facilities Management, Environmental, Fiscal, Security, Communications and Student Affairs to research and collect data. The interdisciplinary team met over the course of six months to identify hazards and exchange documentation. The plan was developed in four phases: organi- zation of resources, hazard identification and risk management study, development of the hazard mitigation plan, adoption and implementation. Landmark worked with the campus communications office to solicit community feedback that was incorporated into the plan. We worked closely with the State’s HMGP team and prepared all mandatory reporting.
Dillard University was also awarded a grant by FEMA to prepare a campus wide Hazard Mitigation Plan. Landmark Consulting LLC’s Project Management and Compliance Assurance Program co-managed $25K in project cost to develop Dillard University’s Hazard Mitigation Plan. We coordinated the campus resources and formed a committee of University leadership. Landmark Consulting led the committee through the Hazard Mitigation Planning process, including but not limited to a series of meetings, interviews and research. The client’s FEMA approved Plan includes hazard profiles, risk assessments, mitigation goals, strategies, and mitigation priorities.